| 
TUBE 2012
Dusseldorf, Germany
26-30 March 2012
Stand 1C36 |
|
In house manufacturing facilities
- 7 horizontal hydraulic presses for the production of fittings (32, 2*63, 100, 150, 160, 300 ton.)
- 11 Vertical Presses for fitting gauging (60, 3*100, 2*125, 150, 300, 2*400, 2000 ton.)
- 16 fitting cutting machines
- 9 chamfering machines
- 7 tube cutting plants
- 1 furnace for heat treatment
- 1 sand blasting machine
- 1 painting plant
- 2 automatic packing plants
- 4 travelling cranes with a maximum capacity of 5.000 kg
- 3 travelling cranes with a maximum capacity of 7.000 kg
- 6 travelling cranes with a maximum capacity of 20.000 kg
-15 inner means of transport
|